Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 13 results ...

Abotaleb, I S and El-adaway, I H (2017) Construction Bidding Markup Estimation Using a Multistage Decision Theory Approach. Journal of Construction Engineering and Management, 143(01).

Chang, C and Ko, J (2017) New Approach to Estimating the Standard Deviations of Lognormal Cost Variables in the Monte Carlo Analysis of Construction Risks. Journal of Construction Engineering and Management, 143(01).

Francis, A (2017) Simulating Uncertainties in Construction Projects with Chronographical Scheduling Logic. Journal of Construction Engineering and Management, 143(01).

Franz, B, Leicht, R, Molenaar, K and Messner, J (2017) Impact of Team Integration and Group Cohesion on Project Delivery Performance. Journal of Construction Engineering and Management, 143(01).

Gambatese, J A, Pestana, C and Lee, H W (2017) Alignment between Lean Principles and Practices and Worker Safety Behavior. Journal of Construction Engineering and Management, 143(01).

Huang, C and Wong, C K (2017) Discretized Cell Modeling for Optimal Facility Layout Plans of Unequal and Irregular Facilities. Journal of Construction Engineering and Management, 143(01).

Li, D and Lu, M (2017) Automated Generation of Work Breakdown Structure and Project Network Model for Earthworks Project Planning: A Flow Network-Based Optimization Approach. Journal of Construction Engineering and Management, 143(01).

  • Type: Journal Article
  • Keywords: Project control; Earthmoving; Automation; Flow network; Work breakdown structure; Critical-path method; Project planning and design;
  • ISBN/ISSN: 0733-9364
  • URL: https://doi.org/10.1061/(ASCE)CO.1943-7862.0001214
  • Abstract:
    The present research proposes an analytical methodology to automatically generate a work breakdown structure (WBS) and a project network model based on activity-on-node (AON), which consists of two stages: (1) optimizing earthwork volume allocation, which is intended to define haul jobs by identifying the most economical combinations of cut and fill cells, thus minimizing the total haul effort in rough-grading operations and (2) according to the optimization results from Stage 1, establishing WBS and defining precedence relationships among jobs in WBS analytically to enable automated generation of the AON project network model. To simplify the newly devised methodology, a flow network-based technique is developed to facilitate earthwork allocation optimization and AON project network generation. Simulation trace, internal validation, and comparison with related established methods were performed for evaluating the effectiveness of the proposed methodology. To reveal limitations inherent in established methods and cross validate the proposed methodology, two established methods were selected, which represent the state of art in the problem domain. Further validation of the new methodology against established ones entails elaborate simulation experiment design by randomly adjusting earth volumes in each cell of the site and varying site size and statistical analysis of simulation outputs. The comparison-based validation shows advantages of the proposed methodology in (1) ensuring practical feasibility of resulting earthmoving job plans and (2) improving achievable productivity performance of construction operations.

Moussavi Nadoushani, Z S, Hammad, A W A and Akbarnezhad, A (2017) Location Optimization of Tower Crane and Allocation of Material Supply Points in a Construction Site Considering Operating and Rental Costs. Journal of Construction Engineering and Management, 143(01).

Patel, D A and Jha, K N (2017) Developing a Process to Evaluate Construction Project Safety Hazard Index Using the Possibility Approach in India. Journal of Construction Engineering and Management, 143(01).

RazaviAlavi, S and AbouRizk, S (2017) Genetic Algorithm–Simulation Framework for Decision Making in Construction Site Layout Planning. Journal of Construction Engineering and Management, 143(01).

Swei, O, Gregory, J and Kirchain, R (2017) Probabilistic Approach for Long-Run Price Projections: Case Study of Concrete and Asphalt. Journal of Construction Engineering and Management, 143(01).

Umer, W, Li, H, Szeto, G P Y and Wong, A Y L (2017) Identification of Biomechanical Risk Factors for the Development of Lower-Back Disorders during Manual Rebar Tying. Journal of Construction Engineering and Management, 143(01).

Zhang, S, Bogus, S M, Lippitt, C D and Migliaccio, G C (2017) Estimating Location-Adjustment Factors for Conceptual Cost Estimating Based on Nighttime Light Satellite Imagery. Journal of Construction Engineering and Management, 143(01).